Defer application download until maintenance period
When deploying software to device collections that have a maintenance period the software downloads then waits for the maintenance period to begin installing. It would be great to have the option to defer the downloading process until either the maintenance period or a set amount of time before the maintenance period. This would allow IT departments to defer large software deployments to a time when network traffic is low.
Optionally, provide a new option in the maintenance period settings for when application downloads are allowed to happen.
