Microsoft

System Center Configuration Manager Feedback

Suggestion box powered by UserVoice

How can we improve Configuration Manager?

Calculate ADR Deployment Schedule from ADR start time

The deployments created by ADR's base the available and deadline specific times on the point at which the new deployments get created and not when the ADR was started. This means we have to go and change the available and deadline times each time after the ADR's run.
i.e. ADR starts at 8am, deployment gets created at 8.30 by the currently running ADR, Deployment available and deadline specific times on the ADR deployment will be based off 8.30 instead of 8am.

32 votes
Vote
Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
You have left! (?) (thinking…)
David shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

0 comments

Sign in
(thinking…)
Sign in with: facebook google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base