Microsoft

System Center Configuration Manager Feedback

Suggestion box powered by UserVoice

How can we improve Configuration Manager?

Allow Users to defer installation until some date/time during Enforcement Grace Period

When users receive notification of upcoming required deployment, allow users a 4th option to defer install date to be sometime during grace period. This could be a date input field with a drop down calendar. Available dates should be between deadline and end of grace period.

The notification would have 4 options:
1. Install Right Now
2. Install After Business Hours
3. Defer Install on a specific date during grace period <-- This being new
4. Snooze notification

Additionally, when notification appears for deferred install date...user can choose a new deferred install date as long as the user is within the grace period.

Also, please provide a new state for the deployment like "Deferred". This will tell us that the user deferred the install date beyond the deadline but sometime before the end of the grace period.

82 votes
Vote
Sign in
(thinking…)
Sign in with: Facebook Google
Signed in as (Sign out)
You have left! (?) (thinking…)
Elias Leal shared this idea  ·   ·  Flag idea as inappropriate…  ·  Admin →

0 comments

Sign in
(thinking…)
Sign in with: Facebook Google
Signed in as (Sign out)
Submitting...

Feedback and Knowledge Base